3.0 After signing the contract, Party A should pay the deposit within 3 days
3.1 We collect and study the documents and data, then improve the artwork design solution
3.2 Confirmation by Party A
3.3 Implement the confirmed solution and start production
3.4 Party A makes the progress payment 5 days before installation
3.5 Installation setting